CNC Milling
Significantly Reduced Lead Time for 6061 Aluminum

Last Updated: Aug 12, 2024

Effective June 14, 2024, the lead time for 6061 aluminum in CNC Milling has been significantly reduced.


  • ・Without
    Surface Treatment

    Reduced from 12 days to 8 days for the blank.

    ・With Surface Treatment

    Reduced from 13 days to 10 days for the package with finish.

  • 6061 Aluminum
Surface Treatment Shipping Option As Is To Be
None Standard 12 days 8 days
Economy 26 days 22 days
Clear Anodize
Black Anodize
Black Anodize(matte) 
Standard 13 days 10 days
Economy 27 days 22 days

 

In addition, Economy shipping days have been reduced. As a result, you can now place orders more conveniently with a 30% discount and shipping days as low as 22 days on almost all aluminum materials.
Check here the shipping days for CNC Milling.

We hope you will take this opportunity to order aluminum parts from meviy!

Try meviy out with Smaple Data

meviy Marketing Team

The meviy resources library is your source of information about the mechanical engineering industry. Find here all the news about materials, design tips and the latest meviy updates and release.
Follow MISUMI USA

Share this page

Sign up for the email.