Shipping Days
Caution
[CNC Milling Notice]
The standard shipping days have been extended by 3 days for some steel, stainless steel, and aluminum products. However, the restriction will be lifted and we will resume taking orders on the normal shipping days from Nov. 15.
Caution
*The shipping day(s) will be extended depending on the quantity. Please check the date displayed on the screen for the confirmed shipping day(s).Material, Surface Treatment, and Shipping Day(s)
Material | Surface Treatment | Standard Shipping | Economy Shipping |
---|---|---|---|
1018 Carbon Steel | No treatment | 8 days | 22 days |
Black Oxide | 10 days | 24 days | |
Electroless Nickel | |||
Hard Chrome Plating(Flash Plating) | |||
Trivalent Chromate (Clear) | |||
Trivalent Chromate (Black) | |||
1018 Carbon Steel (polished) | No treatment | 8 days | 22 days |
Black Oxide | 10 days | ||
Electroless Nickel | |||
1018 Carbon Steel (annealed material) | No treatment | 11 days | 25 days |
Black Oxide | 13 days | 27 days | |
Electroless Nickel | |||
Trivalent Chromate (Clear) | |||
1045 Carbon Steel (polished) | No treatment | 8 days | 22 days |
Black Oxide | 10 days | ||
Electroless Nickel | |||
1049 Carbon Steel | No treatment | 8 days | 22 days |
Black Oxide | 10 days | 24 days | |
Electroless Nickel | |||
Hard Chrome Plating(Flash Plating) | |||
Trivalent Chromate (Clear) | |||
Trivalent Chromate (Black) | |||
|
No treatment | 11 days | 25 days |
Black Oxide | 13 days | 27 days | |
Electroless Nickel | |||
Hard Chrome Plating(Flash Plating) | |||
Trivalent Chromate (Clear) | |||
Trivalent Chromate (Black) | |||
NAK55 or equivalent | No treatment | 8 days | 22 days |
4140 Alloy Steel | No treatment | 8 days | 22 days |
Black Oxide | 10 days | 24 days | |
Electroless Nickel | |||
Trivalent Chromate(Clear) | |||
303 Stainless Steel | No treatment | 8 days | 22 days |
304 Stainless Steel | No treatment | 8 days | 22 days |
304 Stainless Steel (polished) | No treatment | 8 days | 22 days |
316 Stainless Steel | No treatment | 12 days | 26 days |
430 Stainless Steel | No treatment | ||
2017 Aluminum Alloy | No treatment | 8 days | 22 days |
Clear Anodize | 10 days | 24 days | |
Black Anodize | |||
Black Anodize (matte) | |||
5052 Aluminum Alloy | No treatment | 8 days | 22 days |
Clear Anodize | 10 days | 24 days | |
Black Anodize | |||
Black Anodize (matte) | |||
6061 Aluminum Alloy | No treatment | 12 days | 26 days |
Clear Anodize | 13 days | 27 days | |
Black Anodize | |||
Black Anodize (matte) | |||
6063S Aluminum Alloy | No treatment | 8 days | 22 days |
Clear Anodize | 10 days | 24 days | |
Black Anodize | |||
7075 Aluminum Alloy | No treatment | 8 days | 22 days |
Clear Anodize | 10 days | 24 days | |
Black Anodize | |||
Black Anodize (matte) | |||
Polyacetal (standard, white) | No treatment | 8 days | 22 days |
Polyacetal (standard, black) | No treatment | ||
MC Nylon (standard, blue) | No treatment | ||
MC Nylon (standard, ivory) | No treatment | ||
MC Nylon (weather resistance, black ash) | No treatment | ||
Bakelite (paper, natural color) | No treatment | ||
Bakelite (paper, black) | No treatment | ||
Bakelite (cloth, natural) | No treatment | ||
PTFE (Fluorine) (standard, white) | No treatment | ||
UHPE | No treatment | ||
UHPE (conductivity, black) | No treatment | ||
ABS (standard, natural color) | No treatment | ||
PEEK (standard, gray-brown) | No treatment |
- * If the number of parts is between 21 and 30, the shipping day(s) will be 2 days in addition to the above.
- * For hard chrome plating and trivalent chromate (black), if the total length X or width Y exceeds 300mm, the shipping days will be 2 days in addition to the above.
- * The above shipping day(s) is an approximation. Please check the day(s) displayed on the screen for the definitive shipping day(s), as it is subject to change depending on operating conditions.