- HELP
- Technical Information
- [FA Mechanical Parts] Turning Parts
- Applicable Parts/Materials
- Lead Times (Material, Surface Treatment, Heat Treatment, Supported Size)
Lead Times (Material, Surface Treatment, Heat Treatment, Supported Size)
Lead Times
Caution
- Points of note regarding manual quotations
- Only Standard Shipping is available for manual quotations. Economy Shipping cannot be selected.
- If you would like to use Economy Shipping for a manual quotation, please enter “Please ship with Economy Shipping” in the comments field to make the request.
- Also, please be aware that once a quotation with Economy Shipping has been generated, it is not possible to change the order to Standard Shipping.
- *In the case of an automatic quotation, Standard Shipping and Economy Shipping can be checked and selected on the meviy screen.
*Heat treatment is now available for selection. If no heat treatment is selected, the part(s) will be provided without heat treatment.
Material | Surface Treatment | Lead Time with Standard Shipping | Lead Time with Economy Shipping | Express Shipping | Expedited Shipping | |
---|---|---|---|---|---|---|
Iron/Steel |
|
None |
|
|
|
|
|
|
|||||
|
Added Lead Time: +4 days | |||||
|
Added Lead Time: +5 days |
*Phosphate Coating is not available for SKD11 and SKD61.
Material | Surface Treatment | Lead Time with Standard Shipping | Lead Time with Economy Shipping | Express Shipping | Expedited Shipping | |
---|---|---|---|---|---|---|
Aluminum |
|
None | Standard 8 Days Lead Time | Added Lead Time: +14 days |
|
|
|
Added Lead Time + 2 days | |||||
|
Added Lead Time: +5 days |
- *Temper cannot be specified.
- *If the size of the model is not available for auto-quotation, the temper cannot be guaranteed.
- *The base treatment for the black anodized aluminum (matte) for the turning parts is chemical treatment.
Material | Surface Treatment | Lead Time with Standard Shipping | Lead Time with Economy Shipping | Express Shipping | Expedited Shipping | |
---|---|---|---|---|---|---|
Stainless Steel |
|
None | Standard 8 Days Lead Time | Added Lead Time: +14 days |
|
|
Material | Surface Treatment | Lead Time with Standard Shipping | Lead Time with Economy Shipping | Express Shipping | Expedited Shipping | |
---|---|---|---|---|---|---|
Copper | Brass C3604-LCd | None | Standard 11 Days Lead Time | Added Lead Time: +14 days |
|
|
Caution
Since copper products have the following characteristics, please be careful how to handle them after delivery.
- Fragile
- Prone to discoloration and rusting due to low moisture resistance
- Discoloration by sebum when touched directly by hand
Material | Surface Treatment | Lead Time with Standard Shipping | Lead Time with Economy Shipping | Express Shipping | Expedited Shipping | |
---|---|---|---|---|---|---|
| Not supported | Standard 8 Days Lead Time | Added Lead Time: +14 days |
|
| |
Standard 8 Days Lead Time |
Heat Treatment and Added Lead Time
Example: 1045 Carbon Steel + Immersion Quenching | Lead Time: 8 days + 4 days for Heat Treatment = 12 days at the earliest
Lead Time with Standard Shipping | Immersion Quenching (Overall Quenching) | Carburizing | Induction Hardening | ||||
---|---|---|---|---|---|---|---|
Hardness | Delivery Date | Hardness | Delivery Date | Hardness | Delivery Date | ||
Material | Delivery Date |
Outer Diameter (D) ≦ Φ100
Overall Length (L) ≦ 200 |
|||||
1045 Carbon Steel |
|
HRC40 to 45 | Added Lead Time + 4 days |
|
|
||
1018 Carbon Steel | Not supported | ||||||
4135 Alloy Steel | HRC35 to 40 | Added Lead Time + 4 days | |||||
4140 Alloy Steel | HRC50~55 | Added Lead Time: +4 days | |||||
O1 Tool Steel | HRC58 to 63 | Added Lead Time: +4 days | |||||
SKD11 | HRC58 to 63 | Added Lead Time: +4 days | |||||
SKD61 * | HRC50~55 | Added Lead Time: +4 days | |||||
SUJ2 | HRC58 to 63 | Added Lead Time: +4 days | |||||
2017 Aluminum Alloy | Not supported | ||||||
5056 Aluminum Alloy | Not supported | ||||||
6061 Aluminum Alloy | Not supported | ||||||
7075 Aluminum Alloy | Not supported | ||||||
303 Stainless Steel | Not supported | ||||||
304 Stainless Steel | Not supported | ||||||
316 Stainless Steel | Not supported | ||||||
440C Stainless Steel | HRC58 to 63 | Added Lead Time: +4 days | |||||
Brass C3604-LCd * | Not supported |
*If “Salt-Bath Nitrocarburizing” and “Heat treatment” are selected, the hardness will be lower than specified above.
Supported Sizes
The parts colored in light blue in the tables below are supported diameters, listed with the number of days that will be added to the standard lead time.
Iron/Steel, Stainless Steel, Aluminum: Size and Extra Lead Time
Material |
---|
1045 Carbon Steel |
1018 Carbon Steel |
4135 Alloy Steel |
4140 Alloy Steel |
O1 Tool Steel |
SKD11 |
SKD61 |
SUJ2 |
303 Stainless Steel |
304 Stainless Steel |
316 Stainless Steel |
440C Stainless Steel |
Overall Length (L) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | 200<L≦250 | 250<L≦300 | 300<L≦500 | 500<L≦1000 | ||
Outer Diameter (D) | 3 ≦ D ≦ 10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | ||||||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time※ | Added Lead Time: +1 day※ | |
50<D≦100 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
100<D≦150 | Added Lead Time + 2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
150<D≦200 | Added Lead Time + 2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||||
200<D≦250 | Added Lead Time: +6 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | |||||
250<D≦300 | Added Lead Time: +6 days | Added Lead Time: +4 days | Added Lead Time: +4 days | ||||||||
300<D≦500 |
- *If the total length exceeds 300mm, it is available for Automatic quotation if it is applicable to “standard materials”.
- →Technical Information > [FA Mechanical Parts] Turning Parts > Accuracy and Machining Specifications > Appearance Quality > Conditions of Use for Standard Materials (Polished bars and Cold finished material)
Material |
---|
2017 Aluminum Alloy |
5056 Aluminum Alloy |
6061 Aluminum Alloy |
7075 Aluminum Alloy |
Overall Length (L) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | 200<L≦250 | 250<L≦300 | 300<L≦500 | 500<L≦1000 | ||
Outer Diameter (D) | 3 ≦ D ≦ 10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | ||||||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
50<D≦75 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
75<D≦100 | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | |||
100<D≦150 | Added Lead Time + 2 days* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | |||
150<D≦200 | Added Lead Time + 2 days* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | Standard Lead Time* | |||||
200<D≦250 | Added Lead Time: +6 days* | Added Lead Time: +4 days* | Added Lead Time: +4 days* | Added Lead Time: +4 days* | Added Lead Time: +4 days* | Added Lead Time: +4 days* | |||||
250<D≦300 | Added Lead Time: +6 days* | Added Lead Time: +4 days* | Added Lead Time: +4 days* | ||||||||
300<D≦500 |
- * Due to international trade regulations D>75mm are not currently eligible for Import to the USA.
Copper: Size and Extra Lead Time
Material |
---|
Brass C3604-LCd |
Full Length (L) | |||||||
---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | ||
Outer Diameter (D) | 3≦D≦10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | ||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |
50<D≦100 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |
100<D≦150 | Added Lead Time: 2 days | Standard Lead Time | Standard Lead Time |
Material |
---|
PP (natural colour) |
Polyacetal (white) |
Polyacetal (black) |
MC Nylon (blue) |
MC Nylon (black ash) |
ABS (natural colour) |
ABS (black) |
Full Length (L) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | 200<L≦250 | 250<L≦300 | 300<L≦500 | 500<L≦1000 | ||
Outer Diameter (D) | 3≦D≦10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||||||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||||
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
50<D≦100 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
100<D≦150 | Added Lead Time: +2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
150<D≦200 | Added Lead Time: +2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | ||||||
200<D≦250 | Added Lead Time: +6 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | ||||||
250<D≦300 | Added Lead Time: +6 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | Added Lead Time: +4 days | ||||||
300<D≦500 |
Material |
---|
PC (transparent) |
PC (black) |
PEEK (gray-brown) |
Full Length (L) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | 200<L≦250 | 250<L≦300 | 300<L≦500 | 500<L≦1000 | ||
Outer Diameter (D) | 3≦D≦10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||||||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||||
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
50<D≦100 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
100<D≦150 | Added Lead Time: +2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
150<D≦200 | Added Lead Time: +2 days | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | ||||||
200<D≦250 | Added Lead Time: +6 days | Added Lead Time: +4 days | |||||||||
250<D≦300 | Added Lead Time: +6 days | Added Lead Time: +4 days | |||||||||
300<D≦500 |
Material |
---|
Full Length (L) | |||||||
---|---|---|---|---|---|---|---|
2≦L<10 | 10≦L≦50 | 50<L≦100 | 100<L≦130 | 130<L≦150 | 150<L≦200 | ||
Outer Diameter (D) | 3≦L≦10 | Standard Lead Time | Standard Lead Time | Standard Lead Time | |||
10<D≦20 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |
20<D≦50 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | |
50<D≦100 | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time | Standard Lead Time |