Shipping Days
Caution
*The shipping day(s) will be extended depending on the quantity. Please check the date displayed on the screen for the confirmed shipping day(s).Caution
- Delivery date selection service for resin materials (-E) is only available for some materials.
- Delivery date selection service (-E) for Steel, Stainless Steel, and Aluminum is available for all materials without surface treatment, but not available for some materials with surface treatment depending on the shape and size.
Caution
Delivery date selection serviceis not available for Manual quotation.
Material, Surface Treatment, and Shipping Day(s)
Material | Surface Treatment | Standard Shipping | Expedite Shipping | Expedite+ Shipping | Economy Shipping |
---|
1018 Carbon Steel | No treatment | 8 days | 6 days |
|
22 days |
---|---|---|---|---|---|
Black Oxide | 10 days | 8 days |
|
||
Electroless Nickel | |||||
Trivalent Chromate (Clear) | ー | ||||
Trivalent Chromate (Black) | ー | ー | |||
Hard Chrome Plating(Flash Plating) | 8 days | ー | |||
Low Temperature Black Chrome | ー | ー | |||
Phosphate Coating | ー | ー | |||
1018 Carbon Steel (polished) | No treatment | 8 days | 6 days | ー | 22 days |
Black Oxide | 10 days | 7 days | ー | ||
Electroless Nickel | ー | ||||
1018 Carbon Steel (annealed material) | No treatment | 11 days | 9 days | ー | 25 days |
Black Oxide | 13 days | 11 days | ー | 27 days | |
Electroless Nickel | ー | ||||
Trivalent Chromate (Clear) | ー | ||||
1045 Carbon Steel (polished) | No treatment | 8 days | 6 days | ー | 22 days |
Black Oxide | 10 days | 7 days | ー | ||
Electroless Nickel | ー | ||||
1049 Carbon Steel | No treatment | 8 days | 6 days |
|
22 days |
Black Oxide | 10 days | 8 days |
|
||
Electroless Nickel | |||||
Trivalent Chromate (Clear) | ー | ||||
Trivalent Chromate (Black) | ー | ー | |||
Hard Chrome Plating(Flash Plating) | 8 days | ー | |||
Low Temperature Black Chrome | ー | ー | |||
Phosphate Coating | ー | ー | |||
|
No treatment | 11 days | 10 days | ー | 25 days |
Black Oxide | 13 days | 11 days | ー | 27 days | |
Electroless Nickel | ー | ||||
Hard Chrome Plating(Flash Plating) | ー | ||||
Trivalent Chromate (Clear) | ー | ||||
Trivalent Chromate (Black) | ー | ー | |||
NAK55 or equivalent | No treatment | 8 days | 6 days | ー | 22 days |
4140 Alloy Steel | No treatment | 8 days | 6 days | ー | 22 days |
Black Oxide | 10 days | ー | ー | ||
Electroless Nickel | ー | ー | |||
Hard Chrome Plating(Flash Plating) | ー | ー | |||
Trivalent Chromate (Clear) | ー | ー | |||
Trivalent Chromate(Black) | ー | ー | |||
Low Temperature Black Chrome | ー | ー | |||
Phosphate Coating | ー | ー | |||
303 Stainless Steel | No treatment | 8 days | 6 days | ー | 22 days |
303 Stainless Steel (annealed) | No treatment | 11 days | ー | ー | 25 days |
304 Stainless Steel | No treatment | 8 days | 6 days | ー | 22 days |
304 Stainless Steel (annealed) | No treatment | 11 days | ー | ー | 25 days |
304 Stainless Steel (polished) | No treatment | 8 days | 6 days | ー | 22 days |
316 Stainless Steel | No treatment | 12 days | 8 days | ー | 26 days |
430 Stainless Steel | No treatment | ー | |||
2017 Aluminum Alloy | No treatment | 8 days | 6 days |
|
22 days |
Clear Anodize | 10 days | 7 days | ー | ||
Black Anodize | ー | ||||
Black Anodize (matte) | 8 days | ー | |||
Hard Anodize (clear) | ー | ー | |||
Red Anodize | ー | ー | |||
Gold Anodize | ー | ー | |||
5052 Aluminum Alloy | No treatment | 8 days | 6 days |
|
22 days |
Clear Anodize | 10 days | 7 days | ー | ||
Black Anodize | ー | ||||
Black Anodize (matte) | 8 days | ー | |||
Hard Anodize (clear) | ー | ー | |||
Red Anodize | ー | ー | |||
Gold Anodize | ー | ー | |||
6061 Aluminum Alloy | No treatment | 8 days | 6 days | ー | 22 days |
Clear Anodize | 10 days | 7 days | ー | ||
Black Anodize | ー | ||||
Black Anodize (matte) | 8 days | ー | |||
Hard Anodize (clear) | ー | ー | |||
Red Anodize | ー | ー | |||
Gold Anodize | ー | ー | |||
6063S Aluminum Alloy | No treatment | 8 days | 6 days | ー | 22 days |
Clear Anodize | 10 days | 7 days | ー | ||
Black Anodize | ー | ||||
7075 Aluminum Alloy | No treatment | 8 days | 6 days |
|
22 days |
Clear Anodize | 10 days | 7 days | ー | ||
Black Anodize | ー | ||||
Black Anodize (matte) | ー | ー | |||
Hard Anodize (clear) | ー | ー | |||
Red Anodize | ー | ー | |||
Gold Anodize | ー | ー | |||
Acetal (standard, white) | No treatment | 8 days | 6 days | ー | 22 days |
Acetal (standard, black) | ー | ||||
MC Nylon (standard, blue) | ー | ||||
MC Nylon (standard, ivory) | ー | ||||
MC Nylon (weather resistance, black ash) | ー | ||||
Bakelite (paper, natural color) | ー | ー | |||
Bakelite (paper, black) | ー | ー | |||
Bakelite (cloth, natural color) | ー | ー | |||
PTFE (standard, white) | ー | ー | |||
UHMWPE (standard, white) | 6 days | ー | |||
UHMWPE (conductivity, black) | ー | ー | |||
ABS (standard, natural color) | 6 days | ー | |||
PEEK (standard, gray-brown) | ー | ー |
- * If the number of parts is between 21 and 30, the shipping day(s) will be 2 days in addition to the above.
- * For hard chrome plating and trivalent chromate (black), if the total length X or width Y exceeds 300mm, the shipping days will be 2 days in addition to the above.
- * The above shipping day(s) is an approximation. Please check the day(s) displayed on the screen for the definitive shipping day(s), as it is subject to change depending on operating conditions.