Shipping Days

  • Orders placed within the cutoff time will be counted starting from the next business day. (Saturdays, Sundays, and holidays are not counted.)
  • *Delivery times may be longer than usual during extended holidays.
  • The shipping dates for auto-quoted items are as follows. The shipping date varies depending on the quantity ordered.
  • *For Welded Sheet Metal services, extended lead times are available in addition to standard shipping dates. Please refer to the “Delivery Options” for details.
  • *For details on welding types and finishing methods, please refer to “Instructions and Details for Welding Information“.
Material: Ferrous MetalsSurface TreatmentStandard ShippingEconomy Shipping*

Standard Welding:

Arc welding, laser welding
Spot welding only
Standard Welding:
Arc welding, laser welding
Spot welding

Welding finish:

Burn Mark Removal Only

Weld finishing:

Grinder finishing
Low Carbon Steel (Cold/Hot Rolled)8 days~9 days~7 days~22 days~
Powder Coating*11 days~9 days~27 days~
Wet Paint*12 days~10 days~
Electroless Nickel Plating10 days11 days~9 days~27 days~
Black Oxide
Trivalent chromate (Clear)
Trivalent chromate (Black)
Low Carbon Steel (Hot Rolled)*9 days~10 days~22 days~
Powder coating*12 days~27 days~
Electroless Nickel Plating11 days~12 days~27 days~
Black Oxide
Trivalent Chromate (Clear)

Low Carbon Steel

(Cold Rolled)
Electrolytic Zinc Plating8 days7 days22 days~
Material: Stainless steel Finishing Method Standard Shipping Economy Shipping *
Standard Welding:
Arc welding, laser welding
Spot welding only
Standard Welding:
Arc welding, laser welding
Spot welding
Welding finish:
Burn Mark Removal Only
Weld finishing:
Grinder finishing
304 Stainless Steel No.1 8 days~ 9 days~
2B 7days 22 days~
Single-Sided #400-Grit Polished
430 Stainless Steel 2B 7 days~ 22 days~
Material: Aluminum Surface Treatment Standard Shipping Economy Shipping *
Standard Welding:
Arc welding, laser welding
Spot welding only
Standard Welding:
Arc welding, laser welding
Spot welding
Welding finish:
Burn Mark Removal Only
Welding finishing:
Grinder finishing
5052 Aluminum Alloy 8 days~ 9 days~ 7 days~ 22 days~
Clear Anodize 10 days~ 11 days~ 27 days~
Black Anodize
Black Anodize (matte)
  • * Due to manufacturing constraints, Low Carbon Steel (Cold/Hot Rolled) sheet thicknesses of 6mm will have one day added to the standard shipping date.
  • * Powder-coated products listed below will have the number of days indicated in the standard shipping date added.
    ・Items with thicknesses of 6mm or greater and approximate Munsell values N1, N9.5, 2.5Y8/14, 5Y7/1: 2 days added
    ・Approximate Munsell values 5Y7.2/1.4, 5P9/1 for all plate thicknesses : 3 days added
  • * If the order includes R-bend shapes, 1 to 2 days will be added to the standard shipping date.
  • * If nut installation is included, add 1-2 days to the standard shipping date.
  • * If two or more plate thicknesses are required, add 1 day to the standard shipping date.
  • * For welded heavy items (total of three sides: length, width, height exceeds 1500mm, or weight exceeds 20kg), add 1 day to the standard shipping date.
  • * For Economy lead time service, the following are excluded: Steel (untreated) over 9mm, certain painted items (powder coating in 2 colors (approximate Munsell values: 5Y7.2/1.4, 5P9/1)), 304 Stainless Steel (NO.1), and 304 Stainless Steel (Single-Sided #400-Grit Polished) are excluded.
  • * Depending on the delivery type, slight color variations may occur in the appearance of plated items. If you wish to standardize the color, please specify in the comments section (Other Additional Instructions) and request a quote from meviy Support.

Recently viewed articles