Lead Times (Material, Surface Treatment, Heat Treatment, Supported Size)

Lead Times

Caution

  • Points of note regarding manual quotations
  • Only Standard Shipping is available for manual quotations. Economy Shipping cannot be selected.
  • If you would like to use Economy Shipping for a manual quotation, please enter “Please ship with Economy Shipping” in the comments field to make the request.
  • Also, please be aware that once a quotation with Economy Shipping has been generated, it is not possible to change the order to Standard Shipping.
  • *In the case of an automatic quotation, Standard Shipping and Economy Shipping can be checked and selected on the meviy screen.
  • *Heat treatment is now available for selection. If no heat treatment is selected, the part(s) will be provided without heat treatment.
  • *For information on tolerance restrictions for certain materials and surface treatments, please see page “Dimensional tolerances that can be specified
Material Surface Treatment Lead Time with Standard Shipping Lead Time with Economy Shipping Express Shipping Expedited Shipping
Iron/Steel
  • 1045 Carbon Steel​
  • 1018 Carbon Steel​
  • 4135 Alloy Steel​​
  • 4140 Alloy Steel​​
  • O1 Tool Steel​
  • SKD11
  • SKD61 *
  • SUJ2​
None
  • Standard 8 Days Lead Time
  • * Standard 11 Days Lead Time
  • Added Lead Time: +14 days
  • Example: 1045 Carbon Steel with Electroless Nickel Plating
  • 8 days at the earliest + 14 days for Economy Shipping + 2 days for surface treatment ⁼ 24 days at the earliest
  • x
  • Available soon
  • x
  • Available soon
  • Electroless Nickel Plating
  • Hard Chrome plating
  • Black Oxide
  • Trivalent Chromate (clear)
  • Trivalent Chromate (black)
  • Added Lead Time + 2 days
  • Example: 1045 Carbon Steel with Electroless Nickel Plating
  • 8 days at the earliest + 2 days for surface treatment = 10 days at the earliest
  • Salt-Bath Nitrocarburizing
  • Low Temperature Black Chrome
Added Lead Time: +4 days
  • Phosphate Coating
Added Lead Time: +5 days

*Phosphate Coating is not available for SKD11 and SKD61.

 MaterialSurface TreatmentLead Time with Standard ShippingLead Time with Economy ShippingExpress ShippingExpedited Shipping
Aluminum
  • 2017 Aluminum Alloy [Temper T4]​
  • 5056 Aluminum Alloy [Temper H34,H112]
  • 6061 Aluminum Alloy [Temper T6]
  • 7075 Aluminum Alloy [Temper T6511]
NoneStandard 8 Days Lead TimeAdded Lead Time: +14 days
  • x
  • Available soon
  • x
  • Available soon
  • Clear Anodize
  • Black Anodize
  • Black Anodize (matte)
Added Lead Time + 2 days
  • Hard Anodize (Clear)​
Added Lead Time: +5 days
  • *Temper cannot be specified.
  • *If the size of the model is not available for auto-quotation, the temper cannot be guaranteed.
  • *The base treatment for the black anodized aluminum (matte) for the CNC Turned parts is chemical treatment.
Material Surface Treatment Lead Time with Standard Shipping Lead Time with Economy Shipping Express Shipping Expedited Shipping
Stainless Steel
  • 303 Stainless Steel
  • 304 Stainless Steel
  • 316 Stainless Steel
  • 440C Stainless Steel
None Standard 8 Days Lead Time Added Lead Time: +14 days
  • x
  • Available soon
  • x
  • Available soon
Material Surface Treatment Lead Time with Standard Shipping Lead Time with Economy Shipping Express Shipping Expedited Shipping
Copper Brass C3604-LCd​ None Standard 11 Days Lead Time Added Lead Time: +14 days
  • x
  • Available soon
  • x
  • Available soon

Caution

Since copper products have the following characteristics, please be careful how to handle them after delivery.

  • Fragile
  • Prone to discoloration and rusting due to low moisture resistance
  • Discoloration by sebum when touched directly by hand
 MaterialSurface TreatmentLead Time with Standard ShippingLead Time with Economy ShippingExpress ShippingExpedited Shipping
 
  • Polyacetal (standard, white)
  • Polyacetal (standard, black)
  • MC Nylon (standard, blue)
  • MC Nylon (weather resistant, black ash)​
  • ABS (standard, natural colour)​
  • ABS (standard, black)​
  • PEEK (standard, gray-brown)​
  • PC (standard, transparent)
  • PC (standard, black)
  • PP (standard, natural colour)
Not supportedStandard 8 Days Lead TimeAdded Lead Time: +14 days
  • ×
  • Available soon
  • ×
  • Available soon
  •  
  •  
  •  
  •  
Standard 8 Days Lead Time
Material Surface Treatment Lead Time with Standard Shipping Lead Time with Economy Shipping Express Shipping Expedited Shipping
Resin
  • Acetal(standard, black)
  • Acetal(standard, white)
  • MC Nylon(standard, blue)
  • MC Nylon(weather resistance, black ash)
  • ABS(standard, black)
  • ABS(standard, natural color)
  • PC(standard, transparent)
  • PC(standard, black)
  • PP(standard, natural color)
  • PTFE(standard, white)
  • PEEK(standard, gray-brown)
  • PPS(standard, natural color)*
  • Acrylic(standard, transparent)
  • UHMWPE(standard, white)
  • PVC(standard, gray)
None Standard 8 Day Lead Time Added Lead Time: +14 days
  • x
  • Available soon
  • x
  • Available soon

*No Glass Fiber Fill

Heat Treatment and Added Lead Time

Example: 1045 Carbon Steel + Immersion Quenching | Lead Time: 6 days + 3 days for Heat Treatment = 9 days

*The Induction Hardening process will also harden an area approximately 5mm past the end of the specified range.
Size Outer Diameter (D) Overall Length (L)
Full Part Hardening 2≦D≦300 3≦L≦300
Selective Hardening​​ 6≦D≦300 5≦L≦300
(Reference) Surface hardness after Salt-Bath Nitrocarburizing
Material Salt-Bath Nitrocarburizing
1045 Carbon Steel HRC45.3~57.8
4135 Alloy Steel​​ HRC52.3~65.6
1018 Carbon Steel​ HRC52.3~65.6
O1 Tool Steel​ HRC52.3~65.6
SKD11​ HRC67.0~72.7
SKD61​ HRC67.0~71.5
SUJ2​​ HRC52.3~65.6

Supported Sizes

The parts colored in light blue in the tables below are supported diameters, listed with the number of days that will be added to the standard lead time.

Delivery time varies depending on the shape.

Iron/Steel, Stainless Steel, Aluminum: Size and Extra Lead Time

Material
1045 Carbon Steel​​
1018 Carbon Steel
4135 Alloy Steel​
4140 Alloy Steel​
O1 Tool Steel​
SKD11
SKD61
SUJ2
  • *If the total length exceeds 300mm, it is available for Automatic quotation if it is applicable to “standard materials”.
  • →Technical Information >CNC Turning > Accuracy and Machining Specifications > Appearance Quality > Round bar specification table

The number of additional days for surface treatment will change as follows. In some cases, depending on the shape, this service may not be available.

Surface Treatment Lead Time Maximum total length L that can be surface treated
Electroless Nickel Plating +7 days 800mm
Black oxide +5 days 2500mm
Trivalent Chromate (clear) +7 days 3000mm
Trivalent Chromate (black) +7 days 3000mm
Material
303 Stainless Steel
304 Stainless Steel
316 Stainless Steel
440C Stainless Steel
Material
2017 Aluminum Alloy​
5056 Aluminum Alloy​
6061 Aluminum Alloy​
7075 Aluminum Alloy​
  • * Due to international trade regulations D>75mm are not currently eligible for Import to the USA.
Copper: Size and Extra Lead Time
Material
Brass C3604-LCd
Full Length (L)
2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200
Outer Diameter (D) 3≦D≦10 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
100<D≦150 Added Lead Time: 2 days Standard Lead Time Standard Lead Time
Resin①: Size and Extra Lead Time
Material
Acetal(standard, white)
Acetal(standard, black)
MC Nylon(standard, blue)
MC Nylon(weather resistance, black ash)
ABS(standard, natural color)
ABS(standard, black)
PP(standard, natural color)
Resin②: Size and Extra Lead Time
Material
PC(standard, transparent)
PC(standard, black)
PEEK(standard, gray-brown)
Resin③: Size and Extra Lead Time
Material
PPS(standard, natural color)
UHMWPE(standard, white)
PTFE(standard, white)
Full Length (L)
1≦L<2 2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200
Outer Diameter (D) 3≦D≦10 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
100<D≦200 Added Lead Time + 2 days Added Lead Time + 2 days Standard Lead Time
Resin④: Size and Extra Lead Time
Material
Acrylic(standard, transparent)
PVC(standard, gray)
Full Length (L)
1≦L<2 2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200
Outer Diameter (D) 3≦D≦10 Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
Material
PP (natural colour)
Polyacetal (white)
Polyacetal (black)
MC Nylon (blue)
MC Nylon (black ash)
ABS (natural colour)
ABS (black)
Full Length (L)
2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200 200<L≦250 250<L≦300 300<L≦500 500<L≦1000
Outer Diameter (D) 3≦D≦10 Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
100<D≦150 Added Lead Time: +2 days Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
150<D≦200 Added Lead Time: +2 days Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
200<D≦250 Added Lead Time: +6 days Added Lead Time: +4 days Added Lead Time: +4 days Added Lead Time: +4 days Added Lead Time: +4 days
250<D≦300 Added Lead Time: +6 days Added Lead Time: +4 days Added Lead Time: +4 days Added Lead Time: +4 days Added Lead Time: +4 days
300<D≦500
Material
PC (transparent)
PC (black)
PEEK (gray-brown)
Full Length (L)
2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200 200<L≦250 250<L≦300 300<L≦500 500<L≦1000
Outer Diameter (D) 3≦D≦10 Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
100<D≦150 Added Lead Time: +2 days Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
150<D≦200 Added Lead Time: +2 days Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
200<D≦250 Added Lead Time: +6 days Added Lead Time: +4 days
250<D≦300 Added Lead Time: +6 days Added Lead Time: +4 days
300<D≦500
Material
Full Length (L)
2≦L<10 10≦L≦50 50<L≦100 100<L≦130 130<L≦150 150<L≦200
Outer Diameter (D) 3≦L≦10 Standard Lead Time Standard Lead Time Standard Lead Time
10<D≦20 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
20<D≦50 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time
50<D≦100 Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time Standard Lead Time